A source-based overview of publicly known candidacies, consortia and locations. Declarations of intent are explicitly distinguished from confirmed tender submissions.
18Member States in the joint procurement procedure
7potential Gigafactories across two lots
€10 bnEU and national public funding
€20+ bnprivate investment sought
NEW
Official procedural change · published 5 November 2026
Old submission links will be replaced; drafts and submitted tenders must be resubmitted
EuroHPC states that, for technical reasons, all drafts and already submitted tenders currently in the system for either lot will not be considered. Applicants must download their documents, recreate them under the new submission links once available and resubmit them.
The new links for Lots 1 and 2 are to be published once the technical solution is in place. EuroHPC advises applicants not to continue working on the existing drafts until then. Only the submission links will change; the published call documents remain unchanged in substance.
Status: official procedural change · Lot 1 remains 4 February 2027 and Lot 2 remains 3 December 2026 · no change in candidate status and no confirmed tender submission.
Important: No public list of submitted tenders is available yet. “Candidacy” and “intention to participate” do not confirm a submission.
Germany / CzechiaIntention to participate · site partnership
Polarise
Polarise · CRA as confirmed site partner; consortium partners remain open
Polarise intends to contribute its own sites to a consortium. On 9 September, Polarise and CRA signed a letter of intent reserving 15 MW at Prague Gateway DC. Possible joint steps in Gigafactory projects are being examined; the specific form is to be defined only in discussions within the relevant consortium.
The agreement therefore confirms neither accession to the Czech bidding consortium nor a lot allocation or tender submission. The final composition remains not publicly confirmed.
Locations: Munich, Oslo and 15 MW of reserved capacity at Prague Gateway DC near Prague; additional prepared land in Bavaria and North Rhine-Westphalia mentioned
Deutsche Telekom · consortium partners not publicly named
In an official media briefing, Telekom states that it is working intensively on the tender and an application for a European AI Gigafactory. This documents a declared intention to participate and application preparations, but does not confirm a tender submission.
Location: unconfirmed. Expansion of the existing Industrial AI Cloud in Munich does not establish that Munich is the planned location for the EuroHPC application.
Free State of Bavaria · Leibniz Supercomputing Centre / Bavarian Academy of Sciences and Humanities · other consortium partners not fully named publicly
The Free State of Bavaria submitted an expression of interest for Blue Swan on 24 June 2025. On 14 October 2025, the Bavarian cabinet reported on further consortium formation and preparations for a Blue Swan Service GmbH. In March 2026, the state government continued to describe the project as an application for an EU AI Gigafactory.
This documents the earlier expression of interest and continued government-backed application preparations. A submission in the current EuroHPC tender and the complete current consortium structure are not publicly confirmed.
2CRSi · Nhood · Demathieu Bard · Equans · Axelera AI · SiPearl · ÉS · Socomec · Projex · Haffner Energy · Viridien · Dassault Systèmes / OUTSCALE
The consortium announced its candidacy before the formal tender opened. On 9 October, Aether Infrastructures signed a preliminary sale agreement for the FR-SXB2 site; according to 2CRSi, a parallel lease allows occupancy of available space from 15 October. This does not confirm final transfer of ownership or a submission in the current EuroHPC procedure.
On 30 October, 2CRSi specified Phase 1 as a 20 MW AI Factory planned from the third quarter of 2027. 2CRSi and Adimes are to jointly handle integration and testing of the servers and modules. According to the disclosure, Aether Infrastructures is currently wholly owned by HAW; HAW is expected to become a minority shareholder when new shareholders enter. This confirms neither a completed accession by new shareholders nor the final ownership and bidder structure, lot assignment or tender submission.
Locations: two planned facilities in the Strasbourg region; preliminary sale agreement specifies FR-SXB2 at the Dumarey-Powerglide site in Port du Rhin
OVHcloud · OVHai · Shadow · Qwant · Gladia · Dragon LLM mentioned as potential partners; no consortium confirmed
OVHcloud officially states that it is considering participation in the EuroHPC procedure. According to the company, participation would only make sense through a newly formed consortium of major GPU users. The named companies are therefore not yet confirmed as members; neither candidacy nor tender submission is publicly confirmed.
Location: not publicly confirmed. The reference to European data centre capacity does not establish an application location.
Ireland / FranceGovernment intention to participate
Irish procurement partnership
Irish government · France; no specific bidding consortium named
On 30 July, Ireland declared its participation in the European AI Gigafactories initiative and announced €10 million for procuring computing time from an AI Gigafactory in France. Implementation is planned over three years through the Irish Centre for High-End Computing at the University of Galway together with CeADAR.
The announced access is conditional on a successful French tender. This documents a government intention to participate and a procurement partnership, but neither an Irish candidacy nor a confirmed tender submission. The French consortium concerned is not publicly confirmed; in particular, the source does not establish a connection to AION or ÆTHER.
Procurement target: AI computing capacity at a location in France; specific location not publicly confirmed
Leonardo · Eni · Fondazione AI4I; other partners open
A candidacy has been reported since the tender opened. Consortium membership, location, funding and formal submission are not fully documented by primary sources.
Coordinated by Banco Português de Fomento · Defined.ai participation confirmed · full company list open
The Portuguese government confirms the candidacy and private partners but has not published a full list. A submission in the current tender is not publicly documented.
Location: Sines; other Portuguese locations have been discussed
HOCHTIEF · Vodafone named as a potential partner; other partners and locations remain open
Handelsblatt reports, citing several informed people from the bidding field, that HOCHTIEF is preparing an independent bid, negotiating with potential partners – including Vodafone – and examining various locations.
Both companies declined to comment on the claims to the newspaper. The bid, partnership, consortium, location, lot assignment and tender submission are therefore not publicly confirmed. The report must be considered separately from the joint IONOS/HOCHTIEF expression of interest from 2025.
Location: according to the media report, several locations are under consideration; none is publicly confirmed
Finnish government · Nokia led the 2025 expression of interest · Nokia / Nscale intended as land purchasers, not confirmed as a EuroHPC consortium
On 8 October, the Finnish government submitted the third supplementary budget for 2026 to Parliament. It proposes an €80 million budget authority for procuring capacity from an EU-led AI Gigafactory. The stated objective is a medium-scale AI Gigafactory in Finland; a corporate consortium is to be selected through competitive procurement for construction and operation.
This documents a formal government step in preparing funding and participation, but confirms neither a tender submission nor the current role or composition of the Nokia-led consortium from the 2025 expression-of-interest phase.
Oulu has a separate municipal preparation step: on 8 September, the urban development committee approved the terms of a preliminary land agreement and subsequent purchase agreement for a campus described as an “AI Gigafactory” at Tervahovintie 10 in Toppila. The intended buyers are Nokia Solutions and Networks Oy and Nscale DC Holdings Finland Oy. The minutes, published on 14 September, stress that the decision does not itself effect a sale or transfer of ownership; the final purchase depends, among other things, on property formation, building permission and land-use and environmental arrangements.
Site preparation: Oulu / Toppila documented by the municipality. Designation as the location of a submitted EuroHPC tender is not publicly confirmed; the government announcement of 8 October does not specify a location. The land decision also does not confirm Nscale’s membership of the bidding consortium.
Sweden / FinlandGovernment intention to participate · procurement partnership
Swedish-Finnish procurement partnership
Swedish government · Swedish Tax Agency · Finland; operator and bidding consortium not publicly named
On 21 October, the Swedish Riksdag granted the budgetary authorisation for Sweden’s participation. On 22 October, the government stated that the Swedish Tax Agency may join the joint EuroHPC procurement agreement signed in July. Sweden intends to procure up to €50 million of computing capacity over five years.
The plan supports a node in Sweden that is to be connected to an AI Gigafactory in Finland. This is a formal government participation and procurement step, but not a confirmed tender submission. The location and operator of the Swedish node, the Finnish bidding consortium and a connection to the Nokia/Nscale project in Oulu are not publicly confirmed.
Structure: Swedish node connected to an AI Gigafactory in Finland; specific locations not publicly confirmed
Poland · Czechia · Lithuania · Hungary; relationship to the private Baltic AI consortium of 2025 still open
Hungary’s government stated that it would join the Polish-led consortium with €25 million in an initial phase. Contributions of €100 million each from Poland and Czechia and €5 million from Lithuania are also mentioned. This documents declared participation and consortium expansion, but not yet a submission in the current tender.
On 3 September, Poland and Czechia signed a government memorandum on AI cooperation. The Polish announcement places it in the context of active Polish Gigafactory participation; the Czech announcement mentions connecting planned Gigafactories. This documents government coordination, but neither a joint bidding consortium nor a submission. Citing Secretary of State Dariusz Standerski directly, PAP Biznes reports three consortia being prepared in Poland. As neither names nor company confirmations are available, this number remains an unconfirmed media report.
Site structure: not publicly confirmed; the relationship of the three reported Polish consortia to the known multinational project, AI Gigafactory CZ and Baltic AI remains open.
AI-KOMU · Ifeile Investments; other consortium partners not fully named publicly
AI-KOMU stated that it had joined the Lithuanian-led Gintaras consortium to prepare an application. Ifeile Investments announced a capital formation mandate for the project, estimated at around €4.6 billion. These two corporate sources document the candidacy and expansion; a tender submission is not publicly confirmed.
Location: Kaunas planned. The relationship to the Polish-led multinational consortium and the Baltic AI expression of interest of 2025 has not been publicly clarified.
České Radiokomunikace · Multiverse Computing · Bull; IT4Innovations mentioned in the preliminary phase
After the tender opened, the Czech Industry Ministry listed Czechia as a medium-scale candidate. On 21 October, CRA and Bull signed a strategic memorandum. Bull is expected to contribute AI systems, software and services and to act as a technology provider and future user. On 22 October, the Ministry expressly confirmed Bull’s integration into the CRA-led consortium supporting the Czech candidacy in the EuroHPC procedure.
CRA and Multiverse Computing had already signed a strategic memorandum; Multiverse declared its intention to take up to 30 MW of capacity and invest up to €50 million. On 14 September, the Ministry also confirmed a joint public procurement agreement concluded with EuroHPC. The candidacy, partnerships and consortium expansion are therefore documented; the final composition of the bidding consortium and a tender submission are not publicly confirmed.
On 20 October, Czech AI Gigafactory a.s., based at CRA’s business address in Prague, was entered in the commercial register; the official publication followed on 22 October. According to the register, its administrative board consists of CRA CEO Miloš Mastník, CRA CCO Petr Možiš and CRA CTO Petr Holý. This documents a formalised legal entity in the CRA project context, but not its role as bidder or SPV in the EuroHPC procedure. Its shareholders, final consortium structure, selected lot and tender submission are not publicly confirmed.
The separate CRA-Polarise agreement of 9 September reserves 15 MW for Polarise at Prague Gateway. The primary sources describe only possible later Gigafactory steps; they do not confirm Polarise as a member of the Czech bidding consortium.
Location: Prague Gateway DC near Prague as a possible project base; the final location specified in the tender is not publicly confirmed. The Prague Declaration of 3 September documents regional infrastructure cooperation, but not the accession of all nine states to this bidding consortium.
Greek government · EuroHPC; PPC / ΔΕΗ known only from the expression-of-interest phase
An inclusion decision dated 31 July 2026 lists the project “Implementation of an Artificial Intelligence Factory (AI Gigafactory)” with €350 million in the Recovery and Resilience Fund. It provides for transferring €350 million to EuroHPC as a voluntary Greek contribution. The official project page states the objective of creating and operating an AI Gigafactory in Greece.
The annex to the decision leaves the precise use of the contribution open: an AI Gigafactory and/or other EuroHPC, AI, quantum or HPC initiatives. This documents a government step in preparing funding and participation, but no specific bidding structure. PPC expressed interest in Western Macedonia in 2025; PPC’s participation in the current tender, a current consortium and a tender submission are not publicly confirmed.
Target area according to the project page: Greece as a whole; Western Macedonia comes from PPC’s earlier expression of interest and is not a confirmed location of a current tender.
There are currently no public projects with this status.
02 · Tender
Two lots, two development phases
Member States generally provide a national contribution matching the EU share. Public offtake commitments are intended to mobilise private investment.
Lot 1 · up to four projects
Medium scale
Phase 1
up to €100 million EU contribution
Phase 2
up to an additional €400 million
Target capacity
at least three times the reference level
Lot 2 · up to three projects
Large scale
Phase 1
up to €200 million EU contribution
Phase 2
up to an additional €800 million
Target capacity
at least four times the reference level
Sources checked · 25 October 2026
Lot 2: What is publicly confirmed?
No bid submission for Lot 2 (“Large-Scale AI Gigafactories”) has yet been publicly confirmed by reliable primary sources. The overview below only shows which known projects could potentially be considered Lot 2 candidates based on their public project descriptions, and whether an explicit Lot 2 assignment or actual bid submission has been confirmed by primary sources. Project scale alone does not confirm the lot assignment.
Project indicators and public evidence for Lot 2
Project
Country
Scale / project indicator
Lot 2 explicitly confirmed?
Bid submission confirmed?
AION
CountryFrance
Scale / project indicatorlarge-scale French candidacy
Lot 2 explicitly confirmed?not publicly confirmed
Bid submission confirmed?No / not publicly confirmed
Bid submission confirmed?No / not publicly confirmed
Evidence note: This is not a confirmed list of Lot 2 bidders. Project indicators describe public announcements, not a technical eligibility assessment. The medium-scale Czech candidacy and site preparation in Oulu are included to clarify these distinctions. The Finnish government names a medium-scale Gigafactory as its objective; this does not establish a Lot 2 assignment for Nokia / Oulu. “No / not publicly confirmed” indicates a lack of public evidence, not proof that no bid has been submitted.
Primary sources for project announcements and the procedure; none of the sources linked here confirms a Lot 2 bid submission: